Groundwork

  • Internal van bodywork treatment
  • Install plywood lining if required
  • Insulation and vapour lock barrier throughout
  • Electrical Cable runs
  • Window installation

IMG_1447

Carcass

  • Roof profiling and plylining
  • Bed framework and ply interior
  • Board storage,shelving and wet areas
  • Battery and Gas storage
The curved, internal shelving unit pinned into place

The curved, internal shelving unit pinned into place

First Fix

  • Internal Ply surfaces, wall lining
  • Step details and storage
  • Bunk pod aperture install

side bunk cut outs

Second Fix

  • Kitchen unit and worktop build and install
  • Electrical riser install , charging system and hookup.
  • Seats, handbreak system
  • Bulkhead / footwell modification and finish
kitchen unit in campervan

Kitchen unit nearly ready

Final Fix

  • Floor installation and treatment
  • Surface prep,treatment and painting
  • Electrical termination
  • Ply detailing
  • Build and install table surface
Floor is in . Taps are on. Sparks are sorted. The final furlong

Floor is in . Taps are on. Sparks are sorted.
The final furlong

 

Top Bunk , Rear Bunk with storage steps and kitchen unit

Top Bunk , Rear Bunk with storage steps and kitchen unit

 